VidhiSangh

Supreme Court of India · 09/07/2019

SHIV DARSHAN SINGH versus RAKESH TIWARI, DIRECTOR GENERAL, ARCHAEOLOGICAL SURVEY OF INDIA (ASI) & ORS.

[2019] 9 S.C.R. 153 · 2019 INSC 735

AI-generated headnote. Verify against the judgment before relying on it. Paragraph numbers refer to the judgment.

Summary

Contempt proceedings concerning a building near Jantar Mantar were closed because the earlier judgment contained no express demolition direction for the existing structure, and repair permissions had been revoked before the contempt petition. The Court’s inspection-based assessment noted no vertical or horizontal expansion since 2003. It left the legality of permissions, the structure’s status and any demolition to the pending proceedings, without validating the construction.

Issues

  1. Whether non-demolition and the subsequently revoked repair permissions established contempt of the 2012 judgment.
  2. Whether demolition of the existing structure could be ordered in these contempt proceedings.

Held

Result

Contempt petition closed. High Court requested to dispose of all pending matters expeditiously, preferably within six months, in light of the earlier judgment. All issues, including the existing structure’s status and whether it should be demolished, left for decision in those matters.

Judgment PDF: Supreme Court of India, [2019] 9 S.C.R. 153.