VidhiSangh

Supreme Court of India · 12/02/2019

BUNDI ZILA PETROL PUMP DEALERS ASSOCIATION BUNDI versus SANYOJAK BUNDI ZILA PETROL MAZDOOR SANGH(B.M.S.)

[2019] 2 S.C.R. 717 · 2019 INSC 179

AI-generated headnote. Verify against the judgment before relying on it. Paragraph numbers refer to the judgment.

Summary

An ex parte industrial award concerning petrol-pump workers’ demands was set aside so that both sides could contest the reference. The employer association had shown sufficient cause for its absence and lack of knowledge from inception, rather than abandoning proceedings after appearing. Substantial justice required a hearing on merits. The High Court orders and award were set aside and the reference remanded with liberty to plead, produce documents and lead evidence.

Issues

  1. Whether the employer association should be given an opportunity to contest the industrial reference decided ex parte.

Held

Result

Appeals allowed; Division Bench and Single Judge orders and the ex parte award set aside. Reference remanded to Industrial Tribunal, Kota; parties directed to appear on 5 March 2019.

Judgment PDF: Supreme Court of India, [2019] 2 S.C.R. 717.