VidhiSangh

Supreme Court of India · 19/05/2023

TATA MOTORS LIMITED versus THE BRIHAN MUMBAI ELECTRIC SUPPLY & TRANSPORT UNDERTAKING (BEST) AND OTHERS

[2023] 6 S.C.R. 695 · 2023 INSC 574

AI-generated headnote. Verify against the judgment before relying on it. Paragraph numbers refer to the judgment.

Summary

The Court upheld Tata Motors’ disqualification for offering an operating range under standard testing conditions instead of the required actual conditions. It restored BEST’s award to EVEY: the corrected undertaking was a document for the successful bidder, outside the mandatory technical submissions, and accepting its correction did not establish favouritism. Public interest and the cost of disrupting the ongoing contract also weighed against interference.

Issues

  1. Whether Tata Motors complied with the essential operating-range requirement.
  2. Whether permitting EVEY to correct Annexure Y after technical bids opened invalidated its bid.
  3. Whether the High Court should have interfered with the award at the instance of a disqualified bidder in these circumstances.

Provisions considered

Held

Result

Tata Motors’ appeal dismissed. EVEY’s and BEST’s appeals allowed to the stated extent; High Court interference with acceptance of EVEY’s tender and provision for re-tendering set aside. No costs; pending applications disposed of.

Judgment PDF: Supreme Court of India, [2023] 6 S.C.R. 695.