Supreme Court of India · 07/05/2026

DELHI ELECTRICITY REGULATORY COMMISSION versus TATA POWER DELHI DISTRIBUTION LIMITED

[2026] 5 S.C.R. 441 · 2026 INSC 461

AI-generated headnote. Verify against the judgment before relying on it. Paragraph numbers refer to the judgment.

Summary

A generating utility cannot recover depreciation from consumers over the full fifteen-year technical life of a plant that was approved to supply electricity, and did supply it, only for six years up to March 2018. Regulation 6.32 of the DERC Generation Tariff Regulations, 2011 must be read with Regulation 4.1 and Section 61(d) of the Electricity Act, 2003. APTEL's judgment was set aside and the Commission's order restored.

Issues

  1. Whether depreciation must be allowed over the entire technical useful life of an asset regardless of the period during which it actually supplies electricity.
  2. Whether Regulation 6.32 of the 2011 Regulations gives a generating utility an absolute right to recover the entire capital cost over the useful life even after the asset stops supplying consumers.
  3. Whether APTEL erred in disregarding the regulatory framework and approval conditions that limited the plant's operational and recovery period to six years.

Provisions considered

Held

Result

Appeal allowed. APTEL's judgment dated 10.02.2025 was set aside and the Commission's order dated 11.11.2019 was restored. No order as to costs.