Supreme Court of India · 24/08/2022

PUSHPENDRA KUMAR SINHA versus STATE OF JHARKHAND

[2022] 11 S.C.R. 25 · 2022 INSC 860

AI-generated headnote. Verify against the judgment before relying on it. Paragraph numbers refer to the judgment.

Summary

An Executive Engineer of the Jharkhand State Electricity Board was charged under the IPC and the Prevention of Corruption Act over a contract with Ramjee Power Construction. After a Board meeting extended the contractor's time instead of terminating, he had prepared a 2007 note seeking instructions on appointing an arbitrator and waiving penalty, as the Advocate General had advised in similar matters. The arbitrator's interim award was later implemented by Board resolution after the Advocate General's opinion. The Special Judge refused discharge and the High Court dismissed revision. The Supreme Court discharged him. He played no part in the decisions, his note sought instructions in line with Board decisions and legal advice, he authorised no payment, and no illegal gratification was shown. Senior decision-makers had not been prosecuted.

Issues

  1. Whether an Executive Engineer who prepared a file note seeking instructions on appointing an arbitrator could be prosecuted for cheating, criminal breach of trust, forgery and criminal misconduct over the later implementation of an arbitral award
  2. Whether the material disclosed a prima facie case to frame charges

Provisions considered

Held

Result

Appeal allowed; the orders refusing discharge were set aside and the appellant was discharged in Special Case No. 02 of 2011.